Factory Acceptance Test: What We Check Before Every Plant Ships
Quick Answer
Every batching plant is assembled and tested at our factory before it is packed. Here is what our quality team checks.

Before a batching plant leaves our workshop, the main units are pre-assembled and tested. This shortens installation on site and catches problems while they are still easy to fix.
Main checks
- Weighing systems calibrated with certified test weights
- Mixer run-in with shaft-end seals and lubrication checked
- Control cabinet wiring, interlocks and emergency stops tested
- Belt conveyor alignment and screw conveyor rotation
Customers are welcome to join the test in person or by video call, and the results are recorded in the delivery file.