Our Export Packing Checklist for Overseas Shipments
Quick Answer
From waterproof wrapping to container lashing, these are the steps we follow before a machine leaves our factory.

Machines often travel for weeks by sea before reaching the customer. Our logistics team follows a fixed checklist for every order.
- Electrical cabinets sealed and wrapped against moisture
- Loose parts packed in numbered wooden cases with a packing list
- Steel structures lashed and blocked inside 40HQ or flat-rack containers
- Photos of loading sent to the customer before departure
Explore Products


